Project | Client | Comment | |
---|---|---|---|
* Technical peer review: wastewater disposal options | Iwi authority | Land application alternatives to harbour outfall | |
* Computational hydraulic modelling for river habitat design | Iwi authority and regional council | With ecology and landscape collaborators | |
* Water-sensitive urban stormwater system | Subdivision developer | High-level concept design | |
* Stormwater pumping station performance review
|
A local government council |
Hydraulic investigation
|
|
* Technical peer review: water resources for water storage project
|
Another consultancy | Surface water hydrology | |
* Water management plan development
|
A regional government council | Engineering feasibility | |
* Technical peer review: sewer pump network and rising main hydraulic design
|
A local government council | Pre-implementation technical review of design by a major consulting firm | |
* Technical peer review: alternative methodologies for seasonal irrigation demand estimation
|
A water resource management company; a regional council | Expert witness evidence at Hearing based on report | |
* Consultancy report: potential effects of irrigation on wind erosion of soil
|
Two high country stations [farms] | Expert witness evidence at Hearing based on report | |
* Consultancy report: feasibility study of stream ecosystem rehabilitation
|
A local government council and a university |
Collaboration with an ecological engineering consultancy
|
|
* Consultancy report: hydraulic study of culvert with internal pipes | A research institute | A land drainage and water supply 2-purpose culvert |